Abstract
Guidelines for the proper preparations prior to a regulatory inspection are presented. A periodic series of mock inspections with a standardized format is advocated. A review of needed documentation and health physics considerations is given.
Footnotes
↵* Presented as a workshop on April 25, 1975, at the Fourth Annual Spring Symposium sponsored by the Society of Nuclear Medicine Technologist Section, Greater New York Chapter.